April 15, 2005:(1.0 hrs.) Tried to make a little headway on the right fuel tank
while I also addressed various tasks on the wing.
Here I have clamped the access plate cover in
place in preparation for match drilling the nut-plate screw holes.
Once the access plate is match drilled,
the reinforcement plate is cleco'ed into place and the nut-plate rivet
holes are match drilled.
All the holes in the rib, reinforcement
plate, and access plate get deburred. The nut-plate rivet holes in
the rib get dimpled and the reinforcement plate get countersunk.
Deburring the edges of reinforcement plate
with a scotchbrite wheel in my drill press.
Riveted the nut plates to the
reinforcement plate and rib.
April 16, 2005:(1.0 hrs.) Started fabrication of the t-405 attachment angle.
The plans are pretty sketchy with dimension for this thing. There
is a radius call-out with no dimension! The plan detail for this
part is half scale, so I ended up just measuring off the plans.
Here is the part with my first pass rough cut
using the band-saw.
Here is the completed part. The
bottom curve gets its shape from the inside contour of the root tank
rib. Once all the rough cuts are made with the band saw, I use my
bench grinder to smooth everything up.